Stay up to date on the latest news and announcements from OzAurum Resources. Just select a topic below to read more.

News & Media
Follow Us

Heap leach results add shine to OzAurum’s Mulgabbie North

Fresh heap leach wins have strengthened OzAurum’s case for low-cost production at Mulgabbie North as the gold bull run rolls on.

  • Column 1 pulled 90% gold recovery from shallow 2.51g/t oxide ore, with 60% in seven days
  • Column 2 is still running, but deeper 1.35g/t ore has already delivered 75% recovery
  • Meanwhile, the heap leach plant refurb is about 90% complete, with dry commissioning and site works next